Pg 1 of 10Before You Begin:Thank you for purchasing this product. Please identify all parts and hardware pieces before you begin. When layingout parts
Pg 10 of 1013.14.Place rubber collars (G) onto tubularshelves (2).Coloque los collares de caucho (G) sobrelas repisas tubulares (2).Placez les mancho
Pg 2 of 10(A) 4 Top Caps4 Cubiertas superiores4 embouts d'extrémité(C) 4 Feet4 Soportes4 pieds(D) 4 Long Threaded Rods4 Barras largas con rosca4
1.2.Fasten feet (C) to medium threaded rods(E).Asegure los soportes (C) a las barrasmedianas con rosca (E).Fixez les pieds (C) aux douilles taraudéesm
3.E2B4Pg 4 of 10Slide tubular shelf (2) and rings (B) ontomedium threaded rods (E). Screw long tubes(4) onto medium threaded rods (E). Be sureto firml
Pg 5 of 104.Screw short threaded rods (F) into longtubes (4). Slide rings (B) and tubular shelf(2) onto short threaded rods (F).Atornille las barras c
5.Slide tubular shelf (2) and rings (B) ontoshort threaded rods (F).Deslice la repisa tubular (2) y los anillos (B)sobre las barras cortas con rosca (
7.8.Slide tubular shelf (2) and rings (B) ontoshort threaded rods (F).Deslice la repisa tubular (2) y los Deslice losanillos (B) sobre las barras cort
Pg 8 of 109.10.Screw long tubes (4) onto short threadedrods (F). Be sure to firmly tighten long tubes(4).Atornille los tubos largos (4) sobre las barr
Pg 9 of 1011.12.Place rings (B) and tubular shelf (2) on theassembly.Coloque los anillos (B) y repisa tubular (2)en el ensamble.Placez des anneaux (B)
Comments to this Manuals